Facility Improvements Evidence

GRACE Christian School library, Pre-Renovation
Follow the link above for a Google Map 360-degree view of our library prior to renovations.

Under Construction
The following photos are of the construction happening within our library and computer science room.

wallgone
Photo of the removed wall between the library and the Computer Science classroom.
newwalllibraryside
New wall, library side, photo 1.
newwalllibraryside2
New wall, library side, photo 2.

 

Screen Shot 2018-05-31 at 1.47.44 PM
New wall before electrical work, Computer Science side.

 

doorhole
Adding the hole for the eventual door between classroom and library.

Completed Library

Screen Shot 2018-08-27 at 9.13.53 AM
Sliding bookcase in the “closed” position.
Screen Shot 2018-08-27 at 9.14.05 AM
Sliding bookcase in the “open” position. This is to allow for quick and easy access between the space in the media center and the computer science classroom.
Screen Shot 2018-08-27 at 9.14.16 AM
Our renovated library, flipped for a more spacious, open feel.
CSwallupwithwires
Computer Science rooms gets drywall and wiring.
CSwallpainted
Fresh coats of paint!

 

Facility Improvements: Phase II

About half way through our year, we were able to add a number of improvements to the Computer Science room to make it stand out and make it a place that students would really want to come participate in; it helps place our emphasis on this area, since we are striving to improve and build this program at GRACE. The improvements include adjustable tables and workbenches (standing or sitting), all new seating and room arrangement, and much more storage for all of our student projects (so students do not have to dis-assemble and re-assemble everything each time they come to class).

phaseIIpic1phaseIIpic2phaseIIpic3phaseIIpic4phaseIIpic5